Customers

Measured on the floor, not in a deck

Deployments across discrete manufacturing, process industries, packaging and food and beverage — described by pattern rather than by customer name.

1
Smallest deployment we support — one machine
2 wks
Typical pilot to first live line
340+
Protocols & PLC drivers
0
Machines replaced to get started
Deployment patterns

What does a Coneqt deployment usually look like?

Three shapes cover most of what we install. These describe scope and approach — not a customer's results, which we do not publish without written permission.

PLANT PHOTO
Discrete manufacturing

One line first, then the shop

Press, CNC or assembly assets read through gateways on the existing controls. OEE and reason-coded downtime come first, because that is where the argument about lost time lives.

Typical start · 1 line, 4–10 machines
Typical products · Coneqt OEE, then Maintenance
PLANT PHOTO
Process & utilities

Availability and energy together

Continuous plant where uptime and demand charges matter more than piece counts. Machine-level metering sits alongside availability so cost can be attributed to the asset that spent it.

Typical start · utilities plus one process line
Typical products · Coneqt Energy, then OEE
MACHINE PHOTO
Machine builders & OEMs

Connected at build time

Monitoring specified into the machine before it ships, so the builder and the end customer see the same data once it is on the floor.

Typical start · one machine model
Typical products · Coneqt OEE, embedded

Why are there no customer logos on this page?

Because we do not publish a customer's name, logo or numbers without their written permission — and a plant's production data is commercially sensitive in ways a logo strip tends to forget.

If you want evidence rather than a wall of marks, ask for a reference call. We will arrange a conversation with a plant running Coneqt, with their agreement, so you can put your questions to an engineer who has lived with it.

Ask for evidence

A reference call, a pilot on your own line, or both. Both beat a case study you cannot verify.

Start with one line. Scale to the whole network.

A two-week pilot on a single line, on your data, with your team. No rip-and-replace and no new hardware in most plants.

We use only what this site needs to work, plus aggregate traffic counts. No advertising trackers, and we do not sell audience data.